VWSSVERIFIED WORLDWIDE STEEL STOCK
Discuss your project

DELIVERY & PROCESSING

From available stock to shipment-ready pipe.

One coordinated route from stock matching and pipe preparation to inspection, packing and export logistics.

Find your specification

01 / DELIVERY CAPABILITY

A supply plan built around your destination.

We coordinate our own and partner stock resources across China, bringing specification checks, preparation and export arrangements into one supply plan.

01

Match the stock

Identify suitable stock by product standard, grade, dimensions and required quantity.

02

Confirm the allocation

Recheck availability, mill preference, documents and the proposed delivery schedule before order confirmation.

03

Prepare the pipe

Coordinate agreed processing and inspection requirements before packing.

04

Pack for transport

Agree bundle identification, end protection and packing requirements for the shipment.

05

Coordinate export logistics

Arrange shipment preparation and export documentation according to the agreed delivery terms and destination.

06

Keep the order traceable

Coordinate stock references, heat identification and agreed shipment documentation throughout the supply process.

Delivery timing depends on stock allocation, processing scope, inspection requirements and destination. The confirmed quotation and order define the delivery commitment.

02 / PROCESSING CAPABILITY

Pipe prepared for the next stage of your project.

Our own facilities and partner processors coordinate the following services, subject to material, dimensions, drawings and technical acceptance.

01

Cut to length

Prepare pipe lengths to the agreed cutting schedule.

02

Beveling

Prepare pipe ends to the agreed welding or connection requirements.

03

Abrasive blasting

Coordinate surface preparation before the specified protective treatment.

04

Internal & external coatings

Coordinate coating systems and application requirements to the agreed project specification.

05

Threading

Coordinate thread form, end connections and inspection requirements.

06

Pipe bending

Review drawings, material and geometry before confirming the processing route.

07

Welded spool fabrication

Coordinate fabrication against approved drawings and agreed welding and inspection requirements.

08

Heat treatment

Review material and specified treatment conditions before confirming a suitable processing route.

Processing feasibility, dimensional limits, tolerances, inspection scope and lead time are confirmed for each order. Processing is not covered by a blanket next-day delivery promise.

03 / DOCUMENTATION & INSPECTION

Agree the evidence before the work begins.

01

Material documentation

Original mill certificates and heat-number traceability are reviewed against the agreed supply scope.

02

Inspection coordination

Third-party inspection and agreed dimensional, surface or other checks can be coordinated to the order requirements.

03

Shipment documentation

Packing identification and agreed export documents are coordinated with the shipment arrangements.

BUILD YOUR SUPPLY PLAN

Send the specification. We will coordinate the next steps.

Include the standard, grade, outside diameter, wall thickness, quantity, destination and any drawings or processing requirements. We respond within 24 hours to confirm the requirements and next steps.